Example 3
This is an example of a track with a lot of points, the first analysis data is clearly exaggerated, very far of the reality. The IBP would have been 235, in this case it is done 4 analysis to optimize the track. The results obtained are much more reliable, we obtain an IBP index of 146 DC


| < Prev |
|---|





Example 3